The salbullah piles shall be painted with two coats of hot coal tar before driving. The timbers used for bridge works shall be seasoned and treated with preservatives such as ASCU or creosote oil. 50 mm × 50 mm deck stiffeners are also fixed at the bottom of decking planks for the same purpose. thick timber planks are longitudinally placed on both sides of the centre line of the transverse deck for distribution of live loads (wheel loads) over a few decking planks. Wooden sleepers are used as wheel guards on both sides of the carriageway. While the decking planks are fixed on to the timber beams directly by nails, an intermediate packing timber piece is fixed by countersunk bolts over the RSJ for the facility of nailing the decking timber over this timber piece. channel is placed on the top of the piles and RSJ are seated on these channels. When RSJ used over double rows of pile trestle for longer spans, one m.s. Timber beams are used for 3.0 m span superstructure and these beams are seated on single pile trestle by m.s. 18.1 and double rows for 4.5 m and 6.0 m span as in Fig. The piles may be in single row for 3.0 m span as in Fig. These driven depths shall be below the bed level taking into consideration of the possible scouring of the bed if any. diameter driven to 3.0 m for 3.0 m span bridges and 4.5 to 6.0 m for 4.5 m and 6.0 m span bridges. The pile trestle is composed of a cluster of piles usually 200 mm. Timber bridges are generally constructed on salbullah pile trestle as sub-structure and foundation and timber decking over timber beams or over RSJ as superstructure. Callender-Hamilton (Unit Construction) Bridge 4. Needed, you can take an impressive amount of money off of yourīill.This article throws light upon the five main types of low cost bridges. If you can manage to reduce the bundles of materials Each piece is bundled by its size, and each bundle is Section marked Production (P) is the cost needed to make each andĮvery part. People don't know is that next to the overall price, their is a One until it shows white, instead of red or blue. Just make every piece as small as possible to start (30mm), usingĪll carbon steel hollow tubes, and make each piece larger one by I did this one and got the price down to $134 thousand. You use WPBD 2007, the Continuous Arch- Pratt template is the bestĬhoice. Want it as small as possible, you want it as thin as possible. The least expensive bridge is anĪrch bridge and it is less expensive if you make it as compressedĪs possible, but you should keep the 24 meter height. I have the 2011 version and I have gotten done From what I hear, you can make a arch bridge and make it as